Weight Kit Installation - Peco S150XT 05131501 Operator's Manual

Briggs & stratton vanguard
Table of Contents

Advertisement

2-20 Weight Kit Installation

The collection system requires that a weight kit is
installed to the front of the mower to counter-balance the
weight of the collection system, when filled with debris.
NOTE: The weight bracket is secured to the caster
mower frame, then the weight is added to the weight
brackets. It is recommended that two people perform this
procedure. If another person is not available, use a
rolling hydraulic floor jack to keep the weight into
position while you secure the weight to the weight
bracket.
Attach the weight bracket P#(B0523) to the front frame
of the mower using the existing holes. Secure the weight
bracket using (2) 1/2"-13 x 1" HHCS P#(K1231) and (2)
1/2"-13 nylon flange locknuts P#(K2012). Refer to Figure
2-20a.
Figure 2-20a
Figure 2-20b
Position (1) weight bar P#(B2220) on top of the weight
bracket as shown in Figure 2-20b. Center the weight bar
on the weight bracket and secure using (2) 1/2"-13 x 4-
1/4" u-bolts P#(K0331) and (4) 1/2"-13 nylon flange
locknuts P#(K2012).
(2) 1/2"-13 x 1" Hex Bolts
(2) 1/2"-13 Locknuts
(2) 1/2"-13 x 4-1/4" U-Bolts
(4) 1/2"-13 Locknuts
15
Weight Bracket
Weight Bar

Advertisement

Table of Contents
loading

This manual is also suitable for:

S150xt 05131502

Table of Contents