XAV-A1
3-5. SLIDER BOARD
3 two connectors
2 flexible (53P) board
3-6. BRACKET (MOTOR) ASSY (M2)
8 Rotate and remove the bracket (motor) assy block.
RS board
16
(CN3, CN5)
4 screw (M2 × 3)
(CN1)
7 Loosen the special head screw
(M2).
3 connector
1 flexible (34P) board
(CN6)
4 screw (M2 × 3)
5 SLIDER board
3 two connectors
(CN4, CN7)
5 special head screw
(M2)
qa bracket (motor) assy
(M2)
6 tapping screw
RS board
Note: Never remove RS Board
(CN2)
1 stopper washer (gear 1)
2 gear (1)
3 stopper washer (gear)
4 gear (worm wheel)
9 serration screw
(M2 × 3)
0 spacer (PWB)
as the position of gear has been adjusted
in the production.