CAUTION
Insulation of field piping must be carried out up to the con-
nection inside the casing. If the piping is exposed to the
atmosphere, it may cause sweating or burn due to touching
the piping, electric shocks or a fire due to the wiring touch-
ing the piping.
• After leak test, referring to Fig. 15, insulate both the gas and
liquid piping connection with the attached joint insulating
material (6) and (7) to prevent the piping from getting
exposed. Then, tighten the both ends of insulating material
with the clamp (4).
• Wrap the sealing material (Small) (9) around the joint insulat-
ing material (6) (flare nut section), only the gas piping side.
• Make sure to bring the seam of joint insulating material (6)
and (7) to the top.
7
Gas side piping insulating method
Piping insulating material (unit side)
Joint insulating material (6) (accessory)
Bring the seam
Flare nut
to the top
connection
Piping insulating material
(field supply)
For prevention of sweating,
do not expose the piping
Clamp (4) (accessory)
Wrap from the
root of the unit
Sealing material (Small) (9)
(accessory)
Gas piping
Liquid piping
Liquid side piping insulating method
Joint insulating material (7)
(accessory)
Bring the seam
to the top
Flare nut
connection
Piping insulating
material (field supply)
For prevention of sweating,
do not expose the piping
Fig. 15
Do not leave
clearance
Tighten the piping
insulating material
Indoor unit
Piping insulating material
(unit side)
Do not leave clearance
Clamp (4)
(accessory)
Tighten the piping
insulating material
English