5 INSTALLATION

All the operations described in section 5
must be performed exclusively by special-
ised technicians who shall organise all op-
erating sequences and employ suitable
means to ensure strict compliance with the
safety regulations in force.
The machine must be installed inside a lit, ventilated build-
ing with a solid paved, levelled (below 2° inclination) and
firm floor.
The appliance requires supervision and
must be installed in places where it can be
observed by trained personnel.
It is forbidden to install the machine in
places where it can be reached and touched
and/or operated by people who are not
those specified in section 1.2.
The machine must work in environments where tempera-
ture is between 10°C and 40°C.

5.1 Assembly-Siting

The operator must verify the following requirements:
• The site should be suitably prepared for the installation
of the machine;
• The surface on which the machine is installed should be
flat, solid and firm;
• The location should be adequately lit, ventilated and
clean, and the power socket should be easily accessible.
Access to the machine should be kept clear
at all times, in order to allow the operator
to easily work on it and to immediately
leave the working area if required.
38
20 cm
The figure shows the spaces that are required for:
• The proper cooling of the machine parts;
• Access to service groups in case of machine malfunction.
After placing the packaging container near the installation
site, proceed as follows:
While unpacking pay the utmost attention,
so as to avoid abrasions and/or cuts.
1) Remove the staples that keep the packaging closed;
2) Open the carton box using a cutter to cut the tape that
secures the flaps of the box;
3) Lift the machine and place it in the designated area.
Before operating the machine for the first
time, it is necessary to carry out a thorough
cleaning of its parts. For further details, see
the related section.
Remove the upper cover to gain ac-
cess to the inside of the machine.
Remove the protective films from all the machine sheets.
After removing the protective films, reposition the parts on
the machine.
Warning: Before commissioning and using
the machine for the first time, carry out
rinsing operations of the drip tray.