Carry-In Method; Installation Site - Daikin FXVQ125MY1 Installation Manual

Floor standing duct type
Table of Contents

Advertisement

2. Items to be checked at delivery
Items to be checked
Have you carried out field setting? (if necessary)
Are the control box lid, the air filter and the suction grille
attached?
Does the cool air discharge during the cooling
operation and the warm air discharge during heating
operation?
Have you explained how to operate the air conditioner
showing the operation manual to the customer?
Have you explained the description of cooling and
heating given in the operation manual to the customer?
Have you handed the operation manual and the
installation manual to the customer?
Points of the operation explanation
In addition to the general usage, since the items in the
operation manual with the
marks are likely to result in human bodily injuries and
property damages, it is necessary not only to explain
these items to the customer but also to have the
customer read them.
It is also necessary to explain the items of "NOT
MALFUNCTION OF THE AIR CONDITIONER" to the
customer and have the customer read them carefully.

3. CARRY-IN METHOD

Note
Do not throw away the accessories required for installation
until the installation is finished.
• Choose the carry-in route of the indoor unit.
• When lifting the unit with a crane, use belt sling and
perform lifting the unit as shown in the figure below.
Belt sling
3
column
WARNING and
CAUTION
Put a rag or a corrugated
fiberboard to prevent damage of
the suction grille and the control
panel part.
Make sure to sling over the hanger.

4. INSTALLATION SITE

Check
Note
Do not apply force on the resin parts in case of carrying the
indoor unit when and after unpacking.
(1) Select an installation site where the following conditions
are satisfied and obtain the customer's approval before
installation.
• The foundation is strong enough to support the weight
of the unit and the floor is flat to prevent vibration and
noise generation.
• The place where the cold (warm) air is spread all over
the room.
(In case of free blow by the plenum chamber)
• The place where the condensate can be properly
drained.
• The place where there is no possibility of flammable
gas leak.
• The place where is not heat affected by other heating
equipment.
• The space around the unit is adequate for servicing
and the minimum space for air inlet and air outlet is
available.
• The place where the piping length between indoor unit
and outdoor unit is within the allowable limit.
(Refer to the installation manual attached to the
outdoor unit.)
(2) After installation, remove the shipping brackets attached
to the bottom frame.
(3) Secure the unit to its base using foundation bolts.
4-1
EXAMPLE OF REQUIRED SPACE
• Select a suitable pattern from the figure below according
to local space in view of walkway and ventilation when
installing.
(If the given field space fails to meet the conditions of work
in this figure, contact the dealer.)
Piping connection
Left side
Right side
A
500 mm
100 mm
Foundation bolts fixing plate
( 4 Portions )
φ15 hole ( 125-250 type )
φ17 hole ( 400 · 500 type )
Indoor
unit
<
Front
A or more
>
side
900 mm or more
B
100 mm
500 mm
B or more
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxvq200my1Fxvq250my1Fxvq500my1Fxvq500my16Fxvq400my1