The base C9010 configuration package consists of:
•
One C9010 chassis
•
One full-width C9000 Series RPM
– C9000-RPM-2.56T displays in SW output.
– 07KPC3 or 0N90RW is on the HW label.
•
Three C9000 Series fan modules
– C9000-FAN displays in SW output.
– 0C94MF is on the HW label.
•
One AC PSU (110-230V switching)
– C9000-PWR-AC displays in SW output.
– D3000E-S0 is on the HW label.
•
AC power cord (IEC 60320 C19 cable)
•
One DB-9 to RJ-45 serial console cable
•
One rack bar with four screws and washers
•
Eight cage nuts (four for the rack bar; four for the chassis thumb screws)
•
Blank panels: one RPM, three PSU, and nine half-width line card blanks
•
Two cable management brackets
•
C9010 Getting Started Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
•
Software License Agreement
In addition, you can order the following items:
•
Up to three additional PSUs for redundancy or additional power
•
Half-width line cards:
– 6-Port 40 Gigabit Ethernet QSFP+ (C9000LC0640 displays in SW output.)
– 24-Port 1/10 Gigabit Ethernet SFP+ (C9000LC2410G displays in SW output.)
– 24-Port 1/10 Gigabit Ethernet Base-T RJ-45 (C9000LC2410T displays in SW output.)
•
SFP+ optics
•
QSFP+ optics
•
SFP+ direct attach copper (DAC) cables
•
QSFP+ DAC cables
•
DB-9 adapter
•
Dell ReadyRails™ kit (#1 and #2 Phillips and flat-tipped screwdrivers required) with four cage nuts
•
Rack mount tray
•
C1048P port extenders for use with the C9010
Before You Start: Site Preparation
Before installing the C9010 switch, make sure that your installation site meets these requirements:
•
Clearance: Ensure there is adequate space in front of the switch so you can read the light-emitting
diodes (LEDs) and adequate space around and behind the chassis for cabling, power connections,
6
C9010 Hardware Description