FINAL INSTALLATION CHECKLIST

• Check to make sure the circuit breaker is closed (RESET) or the circuit fuses are replaced.
• Be sure power is in service to the building.
• Check that all packing material and tape have been removed. Failure to remove these materials
could result in damage to the appliance once the appliance has been turned on and surfaces have
heated.
• Remove all items from inside the oven.
• Check to be sure that the mounting screws are installed and flush with the side trim
(see Section 9).
• Check that the bottom trim is installed properly (see Bottom Trim Installation).
• Ensure that air duct opening at bottom of unit is free of obstructions.
• Check that oven rack guides (if applicable) are installed correctly and oven racks function smoothly.

OPERATION CHECKLIST

• Turn on the power to the oven (refer to your Owner's Manual). Verify that the bake and broil units and
all cooking functions operate properly.
• See your Owner's Manual for the troubleshooting list.
• Be sure all of the oven controls are OFF before leaving the oven.
• Open the door completely and ensure that there is sufficient clearance to surrounding cabinets and