Page 3
READ CAREFULLY THE BELOW INSTRUCTIONS PRIOR TO THE INSTALLATION THE HEATER! Dear Customer, The Works Cooperative of Dražice – Machine Plant, Ltd, would like to thank you for your decision to use a product of our brand. With this guide, we will introduce you to the use, construction, maintenance and other information on electrical water heaters.
1 TECHNICAL SPECIFICATION OF PRODUCT 1.1 FUNCTION DESCRIPTION OKCE line water heaters use only electricity for heating. Their nominal performance provides sufficient amount of hot water for flat units, premises, restaurants, and similar establishments. 1.2 PRODUCT DESCRIPTION The heater tank is welded from a steel sheet; it is entirely coated with hot water resistant enamel. For additional corrosion protection a magnesium anode is mounted in the upper part of the heater to adjust the electric potential inside the tank, lowing the risk of corrosion.
2 OPERATION AND FITTING INSTRUCTIONS 2.1 OPERATING CONDITIONS The tank shall only be used in accordance with the conditions specified on the power plate and in instructions for electric wiring. Besides legally acknowledged national regulations and standards, also conditions for connection defined in local electric and water works have to be adhered to, as well as the installation and operation manual.
2.2.2 WIRING FOR: OKCE 100 S/2,2 KW, OKCE 125 S/2,2 KW Wiring scheme is attached to the heater wiring on the cover. Connect, repair and control wiring can be performed only company authorized for this activity. Professional involvement must be confirmed by the warranty.
Page 11
The sensors must be inserted all the way in; first the thermostat and then the safety fuse. The performance of heating unit may be adjusted based on either required heating time or connecting possibilities of electric energy distribution in the place of use. Parameters of an electric heating unit for: OKCE 160 S/2,2 kW, OKCE 160 S/3-6 kW, OKCE 200 S/2,2 kW, OKCE 200 S/3-6 kW, OKCE 250 S/2,2 kW, OKCE 250 S/3-6 kW Performance...
Page 13
Wiring scheme Notice: Factory connection must not be changed! Cover of wiring with control Heating unit 2.2 kW Thermostat Heater operation control light Figure 12 Figure 13 Heating unit 3-6 kW The 3-6 kW heating unit allows 4 types of connection based on either required time of heating or possibilities of electric network in the place of use.
2.3 PLUMBING FIXTURE Power water connects to pipes with 3/4“ thread in the bottom part of the heater. Blue – cold water supply, red – hot water outlet. For potential disconnection of the heater, the service water inlets and outlets must be provided with screw coupling Js 3/4“. The safety valve is mounted on the cold water inlet identified with a blue ring.
ADMISSIBLE SAFETY VALVE OPERATING PRESSURE IN Heaters must be provided with a discharge valve STARTING WATER THE COLD PRESSURE HEATER mounted on the cold service water inlet to the WATER PIPE [MPa] PRESSURE heater for potential disassembly or repair. [MPa] [MPa] When assembling the security equipment, follow up to 0.
4 8...
Cold Water Inlet Scheme Figure 16 2.6 HEATER CLEANING AND ANODE ROD EXCHANGE Repetitive water heating causes limestone sediment on both the tank walls and chiefly the flange lid. The sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed.
2.7 SPARE PARTS - Flange lid - flange lid seal - set of M12 (or M10) bolts - Thermostat and thermal fuse - Magnesium anode - insulation flange lid - Control lights with wires - control button for the thermostat - capillary thermometer - Heating element When ordering spare parts, give part name, type and type number from the heater label.
3.1.2 TEMPERATURE SETTING Water temperature is set by turning the thermostat knob. The desired symbol is adjusted against the fixed point on the control panel (Figure 18). Lower temperature range Upper temperature range (about 5°C) (about 74°C) Figure 18 Fixed point on the control panel „Ideal“...
Table 11 Do not try to repair the failure yourselves. Seek either expert or service help. It does not take much for an expert to remove the defect. When making a repair appointment, report the type and serial number you find on the performance plate of your water heater. 4 IMPORTANT NOTICES 4.1 INSTALLATION REGULATIONS Check and exchange the Mg anode regularly.
5 ASSEMBLY GUIDE FOR ZIP-FASTENER INSULATION (Only concerns heaters with the capacity of 750 and 1000 litres) Two people are enough to implement the insulation assembly; three people are required for larger boilers; the assembly must be implemented in areas with the temperature of at least 18°C. If the insulation includes tank bottom insulation, the latter must be mounted first.
Need help?
Do you have a question about the OKCE 100 S/2,2 kW and is the answer not in the manual?
Questions and answers