Operation Procedure - Mitsubishi PKA-RP60KAL.TH Servise Manual

Table of Contents

Advertisement

OPERATION PROCEDURE

3. Removing the electrical box
(1) Remove the panel and the corner box. (Refer to 1.)
(2) Remove the front and side electrical box covers (each 1
screw).
(3) Remove the indoor / outdoor connecting wire from termi-
nal block (TB4).
(4) Disconnect the connectors on the indoor controller board.
(5) Disconnect the connector for ground wire.
(6) Remove the screw on lower side of the electrical box.
(See Photo 5)
(7) Push up the upper fixture catch to remove the box, then
remove it from the box fixture.
4. Removing the nozzle assembly (with vane and
vane motor) and drain hose
(1) Remove the panel and corner box. (Refer to 1.)
(2) Remove the electrical box covers. (Refer to 2.)
(3) Disconnect the vane motor connector (CN151) on the
indoor controller board.
(4) Pull out the drain hose from the nozzle assembly, and
remove nozzle assembly. (See Photo 5)
5. Removing the vane motor
(1) Remove the nozzle assembly. (Refer to 4.)
(2) Remove 2 screws of the vane motor unit cover, and pull
out the vane motor unit.
(3) Remove 2 screws of the vane motor unit.
(4) Remove the vane motor from the vane motor unit.
(5) Disconnect the connector from the vane motor.
OCH452B
Connector for
Photo 4
ground wire
Photo 5
(see the bottom)
Nozzle assembly
Drain hose
Photo 6
Screws of the vane motor unit
Screws of the vane motor unit cover
31
31
PHOTOS
Fixture
Terminal block
(TB4)
Electrical box
Vane motor
Cable strap
Screw of electrical box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents