Daikin FUY71FJV1 Installation Manual page 9

Split system
Hide thumbs Also See for FUY71FJV1:
Table of Contents

Advertisement

3. Attach the retainers to the blocking pad. (Refer to Fig. 12)
Align the projections on the pads with the holes on the
retainers, and tape parts together with 2-sided tape.
Blocking pad (11)
Projection
Fig. 12
4. After installing the blocking pads, attach the center blocking
pad retainer and the top decorative panel. (Refer to Fig. 13)
Center retainer
for blocking pad (14)
Screw for top
Top decorative
decorative plate
plate
Bottom decorative plate
Blocking pad
Top decorative
plate
Fig. 13
CAUTION
Unless blocking pads are installed as indicated, air will leak
and consequently cause dewing.
[TO CHANGE AIR FLOW RATE]
• When shipped from the factory,
the shutters on air discharge out-
lets C and D are closed so that
air flow rate is the same in all four
directions.
• Air flow rate can be changed by
sliding the shutter.
(Refer to Fig. 14)
CAUTION
Be careful not to touch the heat exchanger fins.
2-way air discharge (Refer to Fig. 15)
NOTE
• Illustrations seen from ceiling
English
Retainers for
blocking pad (12)(13)
Hole
2-sided tape
Insert
here.
Insert
here.
Center retainer for
blocking pad (14)
Shutter
Fig. 14
C
B
Piping
area
A
Blocking pad
C
B
Piping
A
area
Moderate flow rate
C
B
A
Blocking pad
C
B
A
C
B
A
Blocking pad
C
A
Fig. 15
D
Shutter
Air discharge
outlet (Indicates
drain pan.)
D
Shutter
D
Moderate
flow rate
D
Moderate
flow rate
D
Moderate
flow rate
D
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents