Power On Procedure - Rorke Data Galaxy 16i User Manual

2gb/s fibre-to-sata raid subsystem scsi-to-sata raid subsystem
Table of Contents

Advertisement

2. BBU Modules – If installed, that the BBU Modules have
been installed correctly.
3. Hard Drives – Hard Drives have been correctly installed on
the drive trays.
4. Drive Trays – ALL the drive trays, whether or not they have
a hard drive, have been installed into the subsystem.
5. Cable Connections – The host ports on the subsystem have
been correctly connected to a host computer.
6. Power Cables – The power cables have been connected to the
PSU modules on the subsystem and plugged into the mains.
7. Ambient Temperature – All the subsystem components have
been acclimated to the surrounding temperature.

4.8.2 Power On Procedure

When powering on the Galaxy 16i subsystem, please follow these
steps.
1. Power on Fibre channel connection devices
These devices include the hubs, switches and any other such
device that has been connected to the Galaxy 16i subsystem.
Please refer to the manual that came with you fibre channel
device to see the power on procedure.
2. Power on JBODs
If the expansion ports on any of the redundant controllers
have been connected to a JBOD, the JBOD must be powered
up first. Please refer to the instruction manual that came with
the JBOD to see how to see it's own power on procedure.
3. Power on the Galaxy 16i subsystem
The Galaxy 16i subsystem should only be powered on after
all the JBODs and fibre channel connection devices have
4-14