IBM DS5100 Installation, User's, And Maintenance Manual page 291

Hide thumbs Also See for DS5100:
Table of Contents

Advertisement

hub
See managed hub 109
I
IBM Safety Information 222
IBM Storage System
replacing a controller 171
IBM System Storage
heat output, airflow, and cooling 30
preparing the rack cabinet 37
site preparation 37
IBM System Storage DS5100 and DS5300
audible alarm 138
best practices 5
cabling the 47
cache memory and cache battery 163
checking the LEDs 143
components 6
connecting power cables 122
controllers 10
diagnostic hardware 201
dimensions 25
DS5100 and DS5300 and one storage expansion
enclosure 80
electrical requirements 29
emergency shutdown 136
environmental requirements and specifications 26
features 2
fibre channel connections 114
front bezel 130
front bezel LEDs 144
hardware maintenance 201
identification numbers 223
installation 42
needed tools 36
installation overview 33
installing into a rack cabinet 33
installing SFP modules 49
installing the configuration 122
installing the DS5100 and DS5300 on the support
rails 43
installing the support rails 38
interconnect-battery unit 20
interconnect-battery unit LEDs 154
introduction 1
inventory checklist 3
operating 127
overheated power supply and fan unit recovery 156
parts list 208
power supply and fan unit LEDs 152
power supply and fan units 19
preparing for installation 35
RAID controller LEDs 145
records 223
releasing levers 170
replacing components 167
resetting the controller circuit breakers 158
restoring power after emergency shutdown 137
restoring power after over-temperature
shutdown 137
IBM System Storage DS5100 and DS5300 (continued)
restoring power after unexpected shutdown 136
seven-segment numeric display 150
SFP modules 22
solving problems 201
specifications 25
storage expansion enclosure cabling topologies 77
storage subsystem ports and controllers 77
troubleshooting 142
turning off 133
turning on 131
unpacking the 36, 41
weight 25
IBM System Storage Productivity Center xxviii
installation
installing the DS5100 and DS5300 on the support
rails 43
into a rack cabinet 33
overview 33
performing 42
preparing for 35
preparing the rack cabinet 37
site preparation 37
rack cabinet 35
support rails 38
interconnect-battery unit
battery packs 164
installing 190
LEDs 22, 154
overview 20
replacing 187
inventory checklist 3
iSCSI
loop configurations 118
L
LC-LC fibre-channel cable 54
connecting to an SFP module 54
latches and lever 59
overview 53
protective caps 57
release latches 56
removing 56
removing from adapter 59
LC-SC fibre-channel cable adapter
connecting to a device 58
connecting to an LC-LC fibre-channel cable 58
protective caps 58
removing an LC-LC fibre-channel cable 59
using 57
LEDs
cache battery 164
diagnostic 150
front bezel 144
interconnect-battery unit 154
power supply and fan unit 152
RAID controller 145
levers and latches 170
line cord jumpers 4
259
Index

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds5300

Table of Contents