IBM DS5100 Installation, User's, And Maintenance Manual page 226

Hide thumbs Also See for DS5100:
Table of Contents

Advertisement

10. Reinstall the battery access cover onto the front of the interconnect-battery
11. Once you have replaced the battery pack, you must reset the battery age
12. Remove the antistatic protection.
13. Install the front bezel by aligning the pins on the storage subsystem chassis
14. Use the Subsystem Management window to check the status of all
15. Do any storage subsystems have a fault (Needs Attention) status?
16. Use the DS Storage Manager client software to print a new storage subsystem
194
IBM System Storage DS5100 and DS5300 Storage Subsystem: Installation, User's, and Maintenance Guide
CAUTION:
This product contains a sealed Lithium Ion battery. Discharged Lithium
and Lithium Ion batteries are currently designated to be disposed of in
normal trash. However, users should contact their municipal waste
disposal facility prior to discarding any used battery in normal trash.
Alternatively, IBM recommends users may return Lithium, Lithium Ion
and Lithium Ion battery packs to IBM for recycling.
In the United States, IBM has established a collection process for reuse,
recycling, or proper disposal of used IBM Lithium, Lithium Ion and
Lithium Ion battery packs. For information on proper disposal of these
batteries, please contact IBM at 1-800-426-4333. Please have the IBM part
number listed on the battery available prior to your call.
For information on disposal of sealed Lithium Ion batteries outside the
United States, go to http://www.ibm.com/ibm/environment/products/
batteryrecycle.shtml or contact your local waste disposal facility.
9. Install the replacement battery pack. Carefully position the battery pack to
ensure that the battery pack will slide correctly into the interconnect-battery
unit. The flat side of the battery pack should face towards the outside of the
chassis. Make sure that the battery bracket slides properly into the slots for the
battery. Slide the battery pack into the interconnect-battery unit. Push the
battery pack firmly into the interconnect-battery unit to ensure that the battery
pack completely engages with the connectors in the interconnect-battery unit.
unit.
through the DS Storage Manager client, by performing these three steps:
v First, you must select the Controller enclosure components icon in the
Physical View of the Storage Manager client. The Controller enclosure
components dialog will be displayed.
v Next, you must select the Batteries icon, and then select Reset. You will be
asked to Confirm Reset. Select Yes to confirm that you want to reset the
battery age.
Now, the battery age clock is reset to 0.
v
with the spring-steel retainers on the cover and then press the cover toward
the chassis until the pins snap into place.
components in the storage subsystem.
v Yes – Select the Recovery Guru toolbar button in the DS Storage Manager
Subsystem Management window, and complete the recovery procedure. If
the problem persists, contact your IBM service representative.
v No – Go to step 16.
profile.
Note: Note that it might take from 15 minutes to a few hours for a new battery
to become fully charged. The DS Storage Manager client will show the
battery as charging until it is fully charged. Controller caching is
automatically disabled until the new battery becomes fully charged.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds5300

Table of Contents