Initial Operation And Set Up - JRC 1500 MKII Instruction Manual

Lcd radar
Table of Contents

Advertisement

3.7 INITIAL OPERATION AND SET UP

3.7.1
INSPECTION AFTER INSTALLATION
After completing the installation and prior to energizing the equipment, it is
necessary to ensure that all steps of the installation were accomplished in ac-
cordance with the instructions. Make sure that:
(1) The cables are not pinched or damaged.
(2) The allowed voltage is not exceeded and the polarity is correct.
(3) All bolts are tight.
(4) The power cable shields has been properly connected to Boat Main ground.
3.7.2
OPERATING THE INITIAL SET UP MENU
To access this menu, push in the JOYSTICK until the INITIAL SET UP menu
appears. The JOYSTICK is then used to select a particular item on the menu by
depressing it.
18
INSTALLATION
INSTALLATION ADJUSTMENTS
BEARING
DISPLAY TIMING
TUNE PRESET
STC PRESET
BUZZER
OPER PROMPTS
LANGUAGE
INSTLLATION ADJUSTMENTS MENU

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Radar 1000Radar 1000 mkii

Table of Contents