Performance Check - Korg PA50 Service Manual

Hide thumbs Also See for PA50:
Table of Contents

Advertisement

20
QA Full Inspection
Pa-50
<PERFORMANCE CHECK>
MIDI THRU, MIDI Clock and Performance Inspection.
After Power on, confirm if Pa50 performs correctly. Following is the method of MIDI THRU and MIDI
Clock Inspection. Please send "Program Change" from Pa50 to MIDI Equipment and Inspect.
1. MODE [PROGRAM] SW on.
2. PROGRAM [PIANO] SW on.
3. ]LOWER/ACC5] SW on
After completion, please check if Pa50 works properly.
After confirmation, please press [STYLE] first, then [START/STOP] and confirm Demo Song is played
correctly.
After confirmation of PA50 operation, this inspection completes. Please make power off and take cables
and Floppy disk out of Pa50.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents