Sampling Inspection For Packing; The Number Of Sampling Inspection - Korg PA50 Service Manual

Hide thumbs Also See for PA50:
Table of Contents

Advertisement

Sampling Inspection for Packing

In order to maintain quality of Packing, sampling inspection to packed up Pa50 should be carried
out every day whenever Pa50 is produced.
Inspection Contents are as follows.
1.

The number of Sampling Inspection

3 pcs. to each Voltage Allocation produced every day.
ex:
one day: produce 30 x 117EX, 20 x 230GE, 20 x 230UK
Sampling Q'ty: 3 x 117EX, 3 x 230GE, 3 x 230UK
2.
Check if Pa50 is put into package as specified.
Check if the product is packed in correct direction. *1)
3.
Check if Accessories specified are put into package as specified
(It depends on each Voltage Allocation)
Parts for Voltage Allocation: AC Cordset/Owner's Manual/Warranty and so on.
4.
Check if Printing on packages is correct (Color, position and so on )
5.
Check if Delivery Label including Serial Number, Product Name, Voltage allocation is
correct. The most important point is that Serial Number printed on label should be same
as one of Pa50 packed.
6.
Please check if Tape and staples specified are used for packing and their position is
correct.
END
Page-1 of 1
*1) It was added on October 24, 2003.
July 25, 2003

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents