Danfoss ECL Comfort 210 Installation Manual page 11

Hide thumbs Also See for ECL Comfort 210:
Table of Contents

Advertisement

Installation Guide
Application A331.2 in general:
The circulation pumps P1 and P2 work in shift according to a
schedule. One pump is used as spare pump and the other pump
is working. In case of malfunction (missing differential pressure)
of one pump, the other pump will take over. An alarm will be
generated and the defective pump can be inspected / repaired.
Alarm (relay 6) can be activated if:
The actual flow temperature differs from the desired flow
temperature.
The activated circulation pump does not generate a pressure
difference.
The refill water function does not generate a pressure within
a preset time.
The universal alarm inputs S9 is activated.
Modbus communication to a SCADA system can be established.
M-bus communication enables connection to flow or energy meter.
The controller can limit the flow or energy to a set maximum but
also in relation to the outdoor temperature.
Furthermore, the M-bus data can be transferred to the Modbus
communication.
Danfoss District Energy
ECL Comfort 210 / 310, application A231 / A331
Typical A331.2 application:
S 1
ECL 310
S 2
S 10
M1
S 5
P 3
P 5
The controller is pre-programmed with factory settings that are shown
in the relevant chapters of this guide.
VI.LG.P1.02
R6
S 9
P S 7
P 1
S 3
P 2
S 8
V1
DEN-SMT/DK
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecl comfort 310

Table of Contents