DeDietrich MCR 24, MCR 24/28MI, MCR 30/35MI, MCR 34/39MI Manual page 16

Wall-hung gas condensation boilers
Hide thumbs Also See for MCR 24, MCR 24/28MI, MCR 30/35MI, MCR 34/39MI:
Table of Contents

Advertisement

- Wait until water comes out of the bleed valve and then close the
bleed connection.
The water may still be hot.
- Check regularly that the installation contains water and is
pressurised. Add water to the installation if necessary.
16
- Switch on the boiler. A bleed cycle of a duration of around 3
minutes is carried out automatically.
- Set the room thermostat or the regulator.
MCR 24, 24/28MI, 30/35MI, 34/39MI
08/06/06 - 300008487-001-A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents