Forced Cooling Operation - Daikin FVXG25K2V1B Service Manual

Inverter pair floor standing type
Hide thumbs Also See for FVXG25K2V1B:
Table of Contents

Advertisement

Forced Cooling Operation

2. Forced Cooling Operation

Conditions
Start
Command
frequency
End
Others
Indoor Unit
Outdoor Unit (25/35 class)
120
Item
The forced cooling operation is allowed when both the following conditions are
met.
1) The outdoor unit is not abnormal and not in the 3-minute standby mode.
2) The outdoor unit is not operating.
The forced cooling operation starts when any of the following conditions is
fulfilled.
1) Press the forced cooling operation [ON/OFF] button (S1W) on the indoor
unit for 5 seconds.
2) Press the forced cooling operation ON/OFF switch (SW1) on the outdoor
unit. (25/35 class: with standby electricity saving function turned off.)
25/35 class: 58 Hz
50 class: 66 Hz
The forced cooling operation ends when any of the following conditions is
fulfilled.
1) The operation ends automatically after 15 minutes.
2) Press the forced cooling operation [ON/OFF] button (S1W) on the indoor
unit again.
3) Press the [ON/OFF] button on the remote controller.
4) Press the forced cooling operation ON/OFF switch (SW1) on the outdoor
unit.
Protection functions have priority over all other functions during forced cooling
operation.
Push here
Forced Cooling
[ON/OFF] button (S1W)
Terminal board
3
2
1
Screwdriver
(R18256)
Trial Operation and Field Settings
SiBE061121_A
(R18369)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents