Tools And Materials Required; Install Mounting Bracket - Revolutions Solaris Owner's Manual

Table of Contents

Advertisement

Tools and Materials Required

• Phillips screw driver
• Flat Head screw driver
• Adjustable pliers or wrench
• Step Ladder
• Wire Cutter
• Electrical tape

Install Mounting Bracket

OFF
Fig. 1
Wood Screw
Ball
Support Pin
Washer
Screw
Ground Wire
Downrod
1. To avoid possible electrical shock, be sure electricity is turned off at the main
power panel before wiring. AII wiring must be in accordance with national
and local electrical codes, and the ceiling fan must be grounded as a
precaution against possible electrical shock.
2. Use mounting hardware.
3. The mounting bracket should be installed to the wooden structure of the
ceiling joist with the two provided wood screws (Fig.1).
Electrical Outlet Box
Mounting Bracket
Flat Washer
ME008-01
CAUTION: Electrical box must be wired
to NOM general use wall switch. To reduce
the risk of injury, turn off power at wall
switch or main fuse or circuit breaker before
attempting installation or servicing.
Rubber Washer
WARNING: To avoid fire or shock,
follow all wiring instructions carefully.
Any electrical work not described in these
instructions should be done or approved by
a licensed electrician.
1.
Disassemble the hanger ball from the downrod by removing
the set screw and lock pin at the end of the downrod. Slide the
hanger ball down the downrod and remove the support pin and
green ground screw and wire.
2.
Place the green ground wire ring terminal on the ground screw
to the new downrod and tighten.
3&4.Place the hang ball on the new downrod and insert the support
pin through the holes at the top ofthe downrod. Slide the hang
ball up the downrod, putting the support pin into the slots of the
hang ball.
5.
Insert the set screw through the hang ball into the downrod and
tighten.
5
11/11/2014

Advertisement

Table of Contents
loading

Table of Contents