Pre-Test Checklist; Operation Checklist - GE CP350 Installation Instructions Manual

30" electric
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
CHECKLISTS
[i]
[]
D
[]
B1
PRE-TEST CHECKLIST
Remove all protective
film, if present, and any
stickers.
Check to be sure that all wiring is secure and
not pinched or in contact with moving parts.
Check level of appliance.
Check that the cooktop is properly grounded.
[]_] OPERATION CHECKLIST
E1
D
EEl
Remove all items from the top of the cooktop
surface.
Turn on the power to the cooktop.(Refer
to
your Owner's Manual.) Verify that all surface
burners operate properly.
Check that the circuit breaker is not tripped
nor the house fuse blown.
Check that conduit is securely connected
to
thejunction
box.
See Owner's Manual for troubleshooting
list.
NOTE TO ELECTRICIAN:
The power leads supplied
with this appliance
are
UL recognized
for connections
to larger gauge
household
wiring. The insulation
of these leads
is rated at temperatures
much higher than
the temperature
rating
of household
wiring.
The current
carrying
capacity
of a conductor
is governed
by the wire gauge and also the
temperature
rating
of the insulation
around the
wire.
NOTE: ALUMINUM
WIRING
,
WARNING:
IHPROPER CONNECTION OF ALUMINUH
HOUSE WIRING TO THE COPPER LEADS CAN
RESULT IN A SERIOUS PROBLEH.
,
Splice copper wires to aluminum
wiring
using special connectors
designed
and UL
approved
for joining
copper to aluminum
and follow the manufacturer's
recommended
connector
procedure
closely.
NOTE: Wire used, location
and enclosure
of
splices, etc., must conform
to good wiring
practice
and local codes.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jp340Jp346Pp912Pp932Pp942Pp944 ... Show all

Table of Contents