Introduction; Commissioning; Electrical Installation - Saunier Duval ISOFAST F 28 E Installation And Operating Instructions Manual

Table of Contents

Advertisement

INTRODUCTION

The ISOFAST F boiler is a wall mounted modulating
combination boiler with electronic ignition providing
central heating and instantaneous hot water. The boiler
is equipped with a 4 litre domestic hot water storage
vessel that ensures maximum hot water temperature
stability during domestic demand.
The boiler is of the I2E+ category for use with Natural
Gas (G20) as distributed in the United Kingdom, or
Butane (G30), Propane (G31) or Towns Gas (G130) with
the appropriate conversion kit.
The boiler has a fan assisted balanced flue which both
discharges the products of combustion to and draws
the combustion air from the outside of the room.
The boiler is suitable for top outlet flue connection only
but, can be fitted with horizontal flue, vertical flue or
twin-pipe flue. Refer to flue catalogue for further de-
tails.
Both the central heating and domestic hot water tem-
perature are user adjustable from the boiler control
panel.
Domestic hot water demand always has priority over
heating demand.
The boiler is designed for use as part of a sealed water
central heating system with fully pumped circulation.
The pump, expansion vessel and associated safety de-
vices are all fitted within the boiler.
The boiler can be installed against either an external wall
or on an adjacent inside wall, that is, the flue system

COMMISSIONING

Gas safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law
that ALL gas appliances are installed and serviced
by a competent person in accordance with the
above regulations.
Gas leak or fault
If a gas leak or fault exists or is suspected, turn the
boiler off and consult the local gas supply com-
pany or your installation/service company.
Air in the heating system
Persistent air in the heating system may indicate
leaks in the system or corrosion taking place. Call
your Installation/Servicing company.
1 -
On/Off button
2 -
Summer/Winter mode selector
3 -
Hot water temperature adjuster
8
Diagram 1
4 -
Hot water set point display
5 -
Graphic display
6 -
Heating temperature adjuster
7
6
5
4
1.5
bar
will pass directly to the rear or to either side to the ter-
minal fitted on the outside wall face.
The installation must be carried out by a competent
person in accordance with the relevant requirements of
The Building Regulations, The Water Byelaws, The
Building Standards (Scotland) Regulations and any ap-
plicable local regulations.
These instructions should be carefully followed for the
safe and economical use of your boiler.
Ancillary equipment
A range of flue accessories are available including ver-
tical flues, twin-pipe flues, bends etc.
For further information contact your supplier.
Substances Hazardous to Health
The adhesives and sealants used in this appliance
are cured and give no known hazard in this state.
INSULATION PADS/CERAMIC FIBRE, GLASSYARN,
MINERAL WOOL
These can cause irritation to skin, eyes and the
respiratory tract. If you have a history skin complaint
you may be susceptible to irritation. High dust levels
are usual only if the material is broken.
Normal handing should not cause discomfort, but
follow normal good hygiene and wash your hands
before eating, drinking or going to the toilet.
If you do suffer irritation to the eyes or severe irritation
to the skin, seek medical attention.
Overheating safety
In the event of a problem, the overheating safety
devices cause safety shutdown of the boiler. If this
happens, call your Installation/Servicing company.
Boiler controls
The control panel, located at the lower front of the
boiler casing, see diagram 1, allows the boiler to
be started, shut down, controlled and monitored
during use.
Flue
Do not obstruct the outside terminal of the boiler.
7 -
Heating set point display
8 -
Display backlight
3
2
1
mode
1
O
I
0
1
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isofast f 35 e

Table of Contents