Replacement Of Components - Benchmark i-mini 30 Installation And Servicing

Hide thumbs Also See for i-mini 30:
Table of Contents

Advertisement

40 RePlACeMent of CoMPonentS

GeneRAl
When replacing ANY component
1. Isolate the electricity supply.
2. Turn off the gas supply.
3. Remove the boiler front panel. Refer to Frame 39.
4. Release the retaining clip and swing the control box down
into its servicing position.
tHe boileR MUSt not be oPeRAted WitHoUt tHe fRont PAnel fitted
41 fAn RePlACeMent
1. Refer to Frame 40.
2. Disconnect the electrical leads from the fan.
3. Remove the clip from the gas control valve.
4. Remove the extended nut retaining the fan
mounting bracket.
5. Lift and remove the fan and venturi assembly.
6. Remove the screw and twist venturi anti-
clockwise to remove venturi assembly, noting
the orientation of the venturi in relation to the
fan body.
7. Transfer the venturi assembly to the new fan,
replacing the 'o' ring if evidence of damage or
deterioration is visible.
8. Fit the new fan / venturi assembly ensuring the
retaining tabs are correctly positioned and the
fan outlet sealing gasket is correctly positioned
and free from damage. Refit the extended nut.
9. Reassemble the boiler in reverse order, taking
care not to overtighten the screw on the fan
mounting bracket.
10. Check the operation of the boiler. Refer to
Frames 29 & 30.
i-mini -
Installation and Servicing
SERVICING
After replacing ANY component check operation of the
boiler, including gas soundness, gas rate and combustion
test.
iMPoRtAnt.
When work is complete, the front panel must be correctly
refitted - ensuring that a good seal is made.
notes.
1. In order to assist fault finding, the control panel has an
LED diagnostic display.
2. In order to replace components in Frames 55-66 it is
necessary to drain the boiler. Refer to Frame 54.
4
8
4
6
3
Retaining Tabs
2
39

Advertisement

Table of Contents
loading

Table of Contents