45 HANDING OVER

After completing the installation and commissioning of the system the
installer should hand over to the householder by the following actions:
1. Hand the User Instructions to the householder and
explain his/her responsibilities under the relevant
national regulations.
2. Explain and demonstrate the lighting and shutting
down procedures.
3. The operation of the boiler and the use and adjustment
of all system controls should be fully explained to the
householder, to ensure the greatest possible fuel
economy consistent with the household requirements of
heating.
Advise the User of the precautions necessary to prevent
damage to the system and to the building in the event
of the system remaining inoperative during frosty
conditions.
4. Explain the function and the use of the boiler heating
controls.
5. Explain the function of the boiler fault mode.
Emphasise that if a fault is indicated, the boiler should
be turned off and a Gas Safe Registered Engineer
consulted. In IE contact Registered Gas Installer
(RGII).
6. Explain and demonstrate the function of time and
temperature controls, radiator valves etc., for the
economic use of the system.
7. If any programmer is fitted then draw attention to the
Programmer Users Instructions and hand them to the
householder.
icos system -
Installation and Servicing
INSTALLATION
8. Loss of system water pressure
Explain that the dial underneath the boiler indicates the
central heating system pressure and that if the normal
COLD pressure of the system is seen to decrease over a
period of time then a water leak is indicated. Explain the
re-pressurising procedure and if unable to re-pressurise
or if the pressure continues to drop a Gas Safe Registered
Engineer should be consulted. In IE consult a Registered
Gas Installer (RGII).
WARNING.
Do not fire the boiler if the pressure has reduced to zero
from the original setting.
9.
After installation and commissioning please complete
the Benchmark Commissioning Checklist before
handover to the customer.
For IE, its is necessary to complete a "Declaration of
Conformity" to indicate compliance to I.S. 813:2002.
10. IMPORTANT
Stress the importance of regular servicing by a Gas Safe
Registered Engineer and that a comprehensive service
should be carried out AT LEAST ONCE A YEAR. In IE
servicing work must be carried out by a Registered Gas
Installer (RGII)
11. As the installer you may wish to undertake the service
contract yourself or alternatively offer to the customer the
benefits of the Ideal Care Scheme, details of which are
outlined in the householder pack supplied with this boiler.
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icos system he24

Table of Contents