back
10 PACKAGING REMOVAL
1. Ensure the boiler is on a sound flat
surface.
2. Carefully remove the strapping.
3. Fold back the top flaps to gain access to:
Instructions
1 year guarantee
Pre-piping frame
Wall mounting template.
(located under pre-piping frame on
protective packaging).
4. Remove the instructions and read
thoroughly before unpacking the product.
5. When ready for installation lift off the
cardboard carton.
11 BOTTOM PANEL REMOVAL
1. Remove the screws from the underside of the
boiler.
2. Pull the RHS of the panel down, slide it to the
right and withdraw.
3. Remove the screws from bottom of the front
panel.
4. Lift panel up and off top pegs.
icos system -
Installation and Servicing
INSTALLATION
Wall mounting template/
protective packaging
Hardware
pack box
3
Retaining
clip
1
Boiler
2
Pre-piping
frame
nm9242
15