IDEAL icos system HE15 Installation And Servicing page 14

Hide thumbs Also See for icos system HE15:
Table of Contents

Advertisement

back
9
UNPACKING
The boiler is supplied fully assembled in one Pack A, together with a telescopic flue
assembly for lengths up to 595mm, rear or side flue outlet, in Pack B.
Unpack and check the contents.
Pack A Contents
A
Boiler
B
Hardware Pack Box
C
Pre-piping Frame
D
These Installation/Users
Instructions
E
Wall Mounting Template
(located on internal
protective packaging)
F
1 Year Guarantee
Hardware Pack Contents
A Isolation valve c/w pressure gauge - 1 off
B Isolation valve c/w drain - 1 off
C Compression gas cock - 1 off
D Valve securing clip 22mm - 2 off
E Valve securing clip 15mm - 1 off
A
G
nm8458
Pack B Contents
A
Telescopic flue terminal
B
Flue turret
C
Rubber Terminal Wall Seal
D
Screw
E
Sealing tape
14
INSTALLATION
A
F Pre-piping frame support bracket - 1 off
G S-trap hose - 1 off
H 15mm olive - 1 off
I
Pressure relief valve nut - 1 off
J
No. 14x2in woodscrew - 4 off
B
C
H
I
B
C
B
D
F
F
D
E
J
L
K
M
N
A
D
icos system -
E
K Wallplug - 4 off
L Fibre washer 19 ID x 26 OD - 3 off
M Gas line sealing washer - 1 off
N Hole plug white - 6 off
P Mains connector - 1 off
P
C
E
isfu8751d
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icos system he24

Table of Contents