Mitsubishi Electric PLA-RP-BA Technical Data Book page 23

Heat pump air conditioners
Hide thumbs Also See for PLA-RP-BA:
Table of Contents

Advertisement

PCA-RP100GA
70
Electrical box
7
2
229
Air intake
Electrical box
2
3
525
When electrical
box is pulled
down
1240 (suspension bolt pitch)
1214
1310
Air outlet
1228
[ Front view ]
5
8
Ceiling
86
138
171
263
687
1235
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. When optional drain lift-up mechanism is installed, always provide
upward piping for refrigerant piping.
6
140
70
161
90
1 Drainage pipe connection (26mm I.D.)
2 Drainage pipe connection (for the left arrangement)
3 Knockout hole for left drain-piping arrangement
1
4
4 Refrigerant-pipe connection (gas pipe side/flared connection)
5 Refrigerant-pipe connection (liquid pipe side/flared connection)
6 Knockout hole for upper drain pipe arrangement
7 Knockout hole for left drain pipe arrangement
8 Knockout hole for wiring arrangement
Use the current nuts meeting the pipe size of the outdoor unit.
Available pipe size
5 LIQUID SIDE
[9.52
4 GAS SIDE
[15.88
[19.05
:Initial flare nut size
23
87
16
RP100
P100
[9.52
[19.05
Unit : mm
182
(3/8F liquid)
(5/8 inch,
198
3/4 inch gas)
245
(Drainage)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents