ACHIA / ACHIBA
AIR-TO-AIR UNITS – COMPACT HORITZONTAL INVERTER
INSTALLATION LOCATION
• Check if the base is able to support the weight of unit during operation.
• Reserve a minimum service area according to Fig. 2.
• Choose a place free of dust or any other foreign material that could clog or damage the condenser coil. The location
should also be a place that cannot be flooded.
• Consult and respect all regulations concerning installation of air conditioning systems.
• Check if sound waves do not disturb anyone.
SERVICE AREA (mm)
WEIGHT DISTRIBUTION (kg)
MODEL
1
601
91
741
110
901
116
UNIT SETTLEMENT
• Make sure that the unit is correctly levelled.
• T he bed frame should be strong and solid enough to support the weight of the machine.
• Verify that the indoor drain is working properly.
2
3
4
76
131
77
80
114
116
102
138
139
TOTAL
375
420
495
7
11.14 207434 Rev.103