Reception; Inspection Upon Receipt; Rigging; Storage - Hitecsa ACHIA 601 Installation, Operation And Maintenance Manual

Air-to-air units – compact horitzontal inverter
Table of Contents

Advertisement

ACHIA / ACHIBA
AIR-TO-AIR UNITS – COMPACT HORITZONTAL INVERTER

RECEPTION

INSPECTION UPON RECEIPT

• Units are delivered with special protective packing; therefore when it arrives, please inspect it carefully to check that no
damage has occurred during transport and that the unit has been supplied complete with all parts specified in the order.
If any damage is found, immediately file a claim with the transport company. (first 48h)
• Verify the correct voltage of the nameplate and make sure it's in accordance with local power supply.
• In case of any flaw or anomaly detected, please contact HITECSA

RIGGING

• Before moving the unit, make sure that all panels are well fixed.
• Raise and set down the equipment carefully.
• Do not tilt the unit more than 15 degrees during transportation.
• When lifting the unit, make sure that it's balanced and stable; bear in mind that the heaviest part is where the
compressor is installed.
• Check minimum length of wire rising.

STORAGE

If the equipment is going to be stored please follow the instructions below in order to avoid damages, corrosion or
deterioration:
• Keep the unit away from direct sunlight, rain, sand, wind or temperatures above 50ºC
• Storage temperature: maximum 50ºC, minimum -10ºC
• Maximum humidity: 90%
6
11.14 207434 Rev.103

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Achia741Achia901Achiba 601Achiba 741Achiba 901

Table of Contents