ADJUSTABLE SHEAVE
DRIVE NO.
BROWNING NO.
1
1VP34x7/8
2
1VP40x7/8
3
1VP34x7/8
4
1VP44x7/8
5
1VP50x7/8
6
1VP50x7/8
7
1VP44x1-1/8
8
1VP50x1-1/8
9
1VP50x1-1/8
1VP50x1-1/8
10
1VP50x1-1/8
11
1VP50x1-1/8
12
ADJUSTABLE SHEAVE
DRIVE NO.
BROWNING NO.
1T
1VP44X7/8
2T
1VP50X7/8
3T
1VP56X7/8
4T
1VP44X7/8
5T
1VP56X7/8
6T
1VP50X7/8
7T
1VP44X11/8
8T
1VP56X11/8
9T
1VP50X11/8
10T
1VP50X11/8
11T
1VP50X11/8
12T
1VP50X11/8
Cooling Start-Up
IMPORTANT-The crankcase heater must be energized
for 24 hours before attempting to start compressor. Set
thermostat so there is no demand to prevent
compressors from cycling. Apply power to unit.
A-Preliminary Checks
1- Make sure that unit is installed in accordance with the
installation instructions and applicable codes.
2- Inspect all electrical wiring, both field‐ and
factory‐installed, for loose connections. Tighten as
required.
3- Check to ensure that refrigerant lines do not rub against
the cabinet or against other refrigerant lines.
TABLE 4
MANUFACTURER'S NUMBERS - NO TENSIONER
OEM PART NO.
BROWNING NO.
31K6901
79J0301
31K6901
53J9601
P-8-2187
P-8-2187
36C0701
P-8-1977
P-8-1977
P-8-1977
P-8-1977
P-8-1977
TABLE 5
MANUFACTURER'S NUMBERS - WITH TENSIONER
OEM PART NO.
BROWNING NO
P81488
BK95X1
P82187
BK90X1
P81494
BK85X1
P81488
BK77X1
P81494
BK85X1
P82187
BK67X1
10023907
BK77X1
P81492
BK85X1
P81977
BK67X1
P81977
BK77X1
P81977
BK67X1
P81977
BK62X1
Page 22
DRIVE COMPONENTS
FIXED SHEAVE
OEM PART NO.
AK61x1
100244-20
AK59x1
31K6801
AK46x1
100244-17
AK74x1
100244-21
AK69x1
37L4701
AK64x1
12L2501
AK74x1
100244-21
AK69x1
37L4701
AK64x1
12L2501
BK77x1
49K4001
BK67x1
100244-24
BK62x1
100244-23
DRIVE COMPONENTS
FIXED SHEAVE
OEM PART NO.
79J2701
P89659
49K4101
49K4001
49K4101
10024424
49K4001
49K4101
10024424
49K4001
10024424
10024423
4- Check voltage at disconnect switch. Voltage must be
within range listed on nameplate. If not, consult
power company and have voltage condition
corrected before starting unit.
5- Make sure filters are in place before start‐up.
B-Start-Up
Supply Air Inverter Units - Refer to the Belt Drive
Supply Air Inverter Start-Up or Direct Drive Variable
Blower section.
1- Initiate first and second stage cooling demands
according to instructions provided with thermostat.
2- First-stage
thermostat
compressor 1. Second-stage thermostat demand will
energize compressor 2. On units with an economizer,
when outdoor air is acceptable, a first-stage demand
BELT
BROWNING NO.
OEM PART NO.
AX54
100245-25
AX55
100245-26
AX52
100245-33
AX58
100245-34
AX58
100245-34
AX57
100245-28
AX58
100245-34
AX58
100245-34
AX57
100245-28
BX59
59A5001
BX57
78L5301
BX56
100245-11
BELT
BROWNING NO.
OEM PART NO.
BX68
88K3401
BX68
88K3401
BX69
10024551
BK66
88K3301
BX69
10024551
BX65
10024508
BX68
88K3401
BX70
31K9601
BX66
88K3301
BX68
88K3401
BX66
88K3301
BX66
88K3301
demand
will
energize