Reel Assembly Removal And Installation - Toro Reelmaster 7000 Service Manual

Table of Contents

Advertisement

Reel Assembly Removal and Installation

21
12
15
16
RIGHT
FRONT
1. Bedbar assembly
2. Flange nut (3 used per side plate)
3. Flange bushing (2 used)
4. Plastic washer (4 used)
5. Metal washer (2 used)
6. Bedbar pivot bolt (2 used)
7. Lock nut (2 used)
8. Shoulder bolt (3 used per side plate)
NOTE: This section provides the procedure for remov-
ing and installing the cutting reel assembly (cutting reel,
spline inserts, grease seals and bearings) from the cut-
ting unit.
NOTE: Refer to Reel Assembly Service later in this sec-
tion for information on replacing cutting reel grease
seals, bearings and spline inserts.
DPA Cutting Units
22
13
2
See text for
tightening
procedure
9. LH side plate
10. Weight
11. Cap screw (2 used)
12. O- -ring
13. Cutting reel
14. Spline insert (LH thread)
15. RH side plate
Page 8 - - 24
1
14
17
18
19
20
9
Grease bore
and threads
Figure 29
NOTE: Removal of the cutting reel requires removal of
the left side plate from the cutting unit frame. The right
side plate does not have to be removed from the frame.
NOTE: Figure 29 shows components when the hydrau-
lic reel motor is on the right side of the cutting unit.
Grease OD surface
27 to 33 ft- -lb
(37 to 44 N- -m)
8
4
3
4
5
6
12
10
11
Antiseize
Lubricant
27 to 33 ft- -lb
(37 to 44 N- -m)
16. Spline insert (RH thread)
17. Retaining ring (2 used)
18. Grease seal (2 used)
19. Bearing (2 used)
20. Bearing adjuster nut
21. Cap screw (2 used)
22. Cutting unit frame
Reelmaster 7000
7

Advertisement

Table of Contents
loading

Table of Contents