Cylinder Head Installation - MTD P90 series Shop Manual

Vertical shaft
Hide thumbs Also See for P90 series:
Table of Contents

Advertisement

P90 Series Vertical Shaft Engines

Cylinder head installation

1.
Place a new head gasket on the cylinder, allowing
the alignment dowels to hold it in place.
See Figure 9.7.
NOTE: The 4P90 series of engines use a metal
head gasket with rubber seals.
2.
Position the cylinder head on the engine block.
3.
Install the 4 head bolts, and tighten them to a step
torque of 41 - 44 ft lbs. (55 - 60 Nm) in an alternating
diagonal pattern. See Figure 9.8.
NOTE: The bolt closest to the exhaust valve must
be the last bolt tightened. Failure to do so
can result in the head bolt loosening up.
NOTE: The head bolts have a self locking thread
form.
4.
Insert the push rods.
5.
Install the rocker arms.
6.
Adjust the valve lash by following the steps
described in Chapter 1: Introduction.
7.
Install the baffle.
8.
Install the muffler by following the steps described in Chapter 8: Exhaust.
9.
Install the carburetor and engine shroud, using new gaskets, by following the steps described in Chapter 3: Air
Intake
10.
Test run the equipment in a safe area before returning it to service. Check all safety features.
86
Dowel pins
Figure 9.7
1
4
Exhaust
port
Figure 9.8
3
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents