Mercury 200 VERADO Installation Manual page 16

Hide thumbs Also See for 200 VERADO:
Table of Contents

Advertisement

200/225/250/275 VERADO 4-STROKE
2. Position the 90° hose fittings to the desired direction. Loosen fastening nuts in order
to rotate. Position fittings and re-tighten fastening nuts.
b
c
3. Remove and discard the shipping caps from the two fittings on the steering cylinder.
Ensure O-ring seals did not lift off with shipping caps.
4. Ensure O-ring seals are in place on end of each fitting.
5. Make the hydraulic steering hose connections to the steering cylinder as shown.
Page 16 / 51
a -
Position fittings
b -
90° fitting
a
a
a -
O-rings
a
a -
Port fitting (L PORT)
a
c -
Straight fitting
b
ob01467
b -
Starboard fitting (R STAR)
ob01465
ob01466
90-10238051

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

250 verado225 verado275 verado

Table of Contents