4 Installation
4.4
Dimensions
183,5
33,5
78
220
1
Condensate discharge
2
Gas connection
3
Heating return
8
1
2
71
375
3
4
5
4
Heating flow
5
Flue pipe connection
4.5
Minimum clearances
C
C
A
B
C
D
4.6
Clearance from combustible components
It is not necessary to maintain a clearance between the
product and components made of combustible materials.
4.7
Using the installation template
▶
Use the installation template to ascertain the locations at
which you need to drill holes and make breakthroughs.
4.8
Wall-mounting the product
A
B
1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
▶
Wall-mount the product as described.
Conditions: The load-bearing capacity of the wall is not sufficient
▶
Ensure that wall-mounting apparatus on-site has a suf-
ficient load-bearing capacity. Use individual stands or
primary walling, for example.
Installation and maintenance instructions ecoTEC plus 0020200871_00
D
Minimum clearance
150 mm
150 mm
5 mm
600 mm