Wall Opening Requirements - Daikin IM 1068-2 Installation & Maintenance Data

Incremental room conditioner with r-410a refrigerant
Table of Contents

Advertisement

Wall Opening Requirements

Before installing the unit, check the wall opening to be sure
the wall sleeve will slide in unobstructed. The rough opening
should measure 25'' × 36½'' (635mm × 927mm) indoors and
14½" × 36½" (368mm x 927mm) outdoors for sizes 007–014
as shown below. The wall box is designed to be mounted
on the floor but may be located above the floor line to clear
obstructions. Without cabinet modifications, the wall box
can be placed up to 1'' (25mm) above the floor. The standard
adjustable kickplate can be telescoped to hide the space below
the wall box. Complete wall box installation instructions can
found on
page
6.
Figure 2: Unit and Wall Box Opening Dimensions
E
Table 1: Dimensions
Unit Size
A
in.
48
007-014
mm
1219
D
A
B
C
D
2½ Min.
7¼ Min.
36¼
64 Min.
184 Min.
921
Sheet metal parts, self-tapping screws, clips and such items in-
herently have sharp edges, and it is necessary that the installer
exercise caution. This equipment is to be installed only by an
experienced installation company which employs trained personnel.
C
L
B
M
H
J
K
E
F
G
24½
13
11
16
146
648
348
CAUTION
F
G
H
J
K
21
3½-5½ Adj.
533
89-140 Adj.
44
IM 1068-2 / Page 5 of 28
Installation
L
M
8
1
203
25

Advertisement

Table of Contents
loading

Table of Contents