Units With Hydronic Heat
The hydronic heat section can be supplied with a short (4¼''
high) control box or a long (13½'' high) control box depend-
ing on the number of options selected. Observe the control
box to determine which one was supplied for the job.
Figure 16: Hydronic Heat Section with Short Control Box
Note: The short control box is used with standard unit mounted manual changeover control, and unit mounted manual
changeover with emergency standby (ESB) power supply.
M
J
E
K
L
A
D
E
in.
45
⁄
37
25
⁄
3
1
4
2
mm
1162
940
648
Notes: See
Figure 6 through Figure 13 on page 8
Junction box 7/8" (22mm) diameter knockouts for 1/2" (12mm) conduit.
See Table 6 for dimension B.
Table 6: Wall Box Dimensions
Wall Box "B"
Dimension
007–014
Overall Length
Wall Box "B"
Dimension
007–014
Overall Length
A
Hydronic
Coil
D
Front View
F
G
H
J
24
⁄
13
⁄
22
⁄
10
1
11
7
2
16
8
622
348
581
254
for dimensions of factory installed valve and return piping stub.
2
⁄
3
⁄
1
1
2
2
10
⁄
11
⁄
1
1
2
2
64
89
267
292
Short Control Box
If the short control box was supplied, field wiring should be
brought into the 2'' × 4'' junction box which is located on the
right-hand side of the heat section (Figure 16).
Short
H
Control Box
Room
Cabinet
Room Cabinet
Mounting Holes (4)
Junction Box
K
L
M
N
16
4
⁄
1
⁄
14
⁄
1
1
3
2
2
4
406
114
38
375
Dimensions - inches
4
5
6
12
13
14
Dimensions - mm
102
127
152
305
330
356
8"
(203mm)
P
N
Wall Box
⁄
''
1
2
(12mm)
Side View
Room Cabinet Removed
P
1
⁄
3
4
44
7
8
15
16
178
203
381
406
Installation
B
F
G
⁄
''
1
4
(6mm)
9
10
17
18
229
254
432
457
IM 1068-2 / Page 11 of 28