Mighty Mule FM502 Installation Manual page 22

Table of Contents

Advertisement

Step 2
Install a low profile ground stop (not provided) beneath the
SECOND gate stop plate.
The ground stop needs to be positioned near the end of the
gate as shown in Illustration A and may be made of metal
or concrete and should be firmly secured in the ground (we
recommend setting it in concrete).
Step 3
Attach a vertical closed position stop plate to the SECOND
gate.
Using appropriate hardware for your type of gate attach
the vertical closed position stop plate to the SECOND gate
frame at the point where it will come in contact with the
ground stop post.. Do not tighten it completely at this time. You must slide the closed position stop plate toward the ground
stop until they touch (Illustration C). Once you have moved the stop plate to the correct position, tighten its hardware
completely.
NOTE: For a push-to-open installation (gate opens out from the property) attach the closed position stop plate to the outside
of the gate.
At this stage of the installation, the openers should be installed on the
gate leaves and the open and closed position stops should be in place.
Post Bracket Assembly
MASTER Gate Opener
Gate Bracket
Closed Position
Positive Stop Plates
18
Closed Position Stop Plate mounted
on the gate leaf that CLOSES FIRST
FRONT VIEW
SECOND Gate Opener
OPTIONAL Closed Position
Ground Stop Post
SIDE VIEW
Closed Position Stop Plate
Low Profile Ground Stop
in Near the Center of Driveway
Illustration C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents