Vertical Through-The-Roof Applications & Installation - MHSC 36CDVXTRN Installation Instructions And Homeowner's Manual

Builder direct vent
Table of Contents

Advertisement

CDVX Series Direct Vent Gas Fireplace
Zero Clearance Sleeve
(if required)
Firestop
7" Pipe
24" (610mm)
Minimum*
BG402
Fig. 53 Below grade installation.
BG402a
Top Vent
Below grade installation
1/26/00 djt
Foundation Recess
Recess Brackets
Watertight Seal
Around Pipe
Fig. 54 Snorkel installation, recessed foundation.
BG401
Vertical Through-the-Roof Applications
Snorkel
2/10/99 djt
This Gas Fireplace has been approved for:
Vertical installations up to 40' (12 m) in height. Up
to a 10' (3 m) horizontal vent run can be installed
within the vent system using a maximum of two 90°
elbows. (Fig. 55)
Up to two 45° elbows may be used within the
horizontal run. For each 45° elbow used on the
horizontal level the maximum horizontal length must
be reduced by 18" (457 mm).
Example: Maximum horizontal length
0 x 45° elbows = 10' (3 m)
1 x 45° elbows = 8¹⁄₂' (2.6 m)
2 x 45° elbows = 7' (2.1 m)
A minimum of an 8' (2.4 m) vertical rise.
26
Screws
7TDVSNORK
(Snorkel)
4" (102mm)
Clearance
Min.
Window
Well
Gravel
Drain
Foundation Wall
*A minimum of 24" (610mm) ver-
tical pipe must be installed when
using the 7TDVSNORK Kit.
*The 22" (559mm) vertical rise
(center to center) of the snorkel
may be included for calculationof
max. horizontal run.
Snorkel
Wall Screws
Sheet Metal
Screws
BG401
Max. Height
40' (12m)
Min. Height
7 ' (2.3m)
Fig. 55 Support straps for horizontal runs.
Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8' (2.m) of
vent pipe can be used between elbows. (Fig. 56)
7DVCS must be used to support offsets. (Fig. 58)
This application will require that you first determine
the roof pitch and use the appropriate starter kit.
(Refer to Venting Components List)
The minimum height of the vent above the highest
point of penetration through the roof is 2' (610 mm).
(Fig. 60)
Vertical Through-the-Roof Installation
1. Locate your fireplace.
2. Plumb to center of the (4" (102 mm) flue collar from
ceiling above and mark position.
3. Cut opening equal to 9³⁄₈" x 9³⁄₈" (240 x 240
mm).10³⁄₈" x 9³⁄₈" (264 x 240 mm) when using
7TCRVT1320.
4. Proceed to plumb for additional openings through the
roof. In all cases, the opening must provide a minimum
of 1" (25 mm) clearance to the vent pipe, i.e., the hole
must be at least 9³⁄₈" x 9³⁄₈" (240 x 240 mm).
5. Place fireplace into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 57)
7. Install roof support (Fig. 58) and roof flashing making
sure upper flange of flashing is below the shingles.
(Fig. 59)
Max. 10' (3m)
Pipe Straps Every
3' (914mm)
FP1244
FP1244
through the roof
max/min dims
12/02
20012253

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

36cdvzrrn36cdvztrn36cdvxrrn

Table of Contents