GENERAL INFORMATION
GI-5
MAINTENANCE INSTRUCTIONS
PREPARING TOOLS AND MEASURING INSTRUMENTS
Before staring any maintenance works make sure that all necessary
tools and measuring instruments are available.
SPECIAL TOOLS
Use special tools, if stipulated in the chapter.
REMOVAL OF ENGINE PARTS
Before starting any mainrenance works try to track the fault cause.
Decide whether the removal or disassembly of the part in question
is necessary.
CLEANING OF REUSABLE PARTS
All reusable parts have to be cleaned carefully and thoroughly and
in a suitable way.