Amana AMVM97 Service Instructions Manual page 44

Hide thumbs Also See for AMVM97:
Table of Contents

Advertisement

OPERATION
CTK0*
4-Position Connectors
Thermostat
from CTK0*
Thermostat Kit
1
2
R
C
1
2 R C
G
W1 W2 Y1
C
System Wiring between Furnace and Non-Communicating
Compatible Single Stage Air Conditioner
Pressure Switch Calibration Routine The modulating fur-
nace must go through a pressure switch calibration routine
before it can begin its first heat cycle. This is performed
automatically by the furnace and requires no action on the
part of the installer other than to have the system compo-
nents installed completely and correctly. On the initial power
up, or any time that power to the furnace is switched off
then back on again and a call for heat is applied, the fur-
nace will go through a calibration routine. During the cali-
bration routine the IFC runs the induced draft blower at
different speeds to determine the opening and closing points
of the pressure switches. It records this information and
uses it as reference points for determining the draft in-
ducer speeds for all gas input rates from 35% - 100%.
Before beginning a calibration routine, the IFC will check
that both pressure switches are in the open position.
·
The IFC powers the draft inducer at a predetermined
speed and checks to see if the LPS has closed.
·
If the LPS is not closed the IFC will increase the draft
inducer RPM in small steps until it detects a closed
LPS.
The IFC then begins to reduce RPM until it detects
that the HPS is open.
It records the RPM point where the HPS went open.
The IFC then adds a predetermined amount of draft
inducer RPM to both the recorded points.
These new RPM points are the draft inducer speed
for 35% (lowest input rate) and 100% (highest input
rate).
The IFC then is able to control draft inducer speed
through the IFC-VFD throughout the entire range of
modulating operation.
44
ComfortNet Compatible
O
Y2
Furnace Integrated
Control Module
Non-ComfortNet Compatible
Y
Single Stage AC
RPM
Closed
LPS
RPM 1
Time
Inducer Calibration Routine
A
D
BBREVIATIONS AND
EFINITIONS
IFC: Integrated furnace control
HSI: Hot surface element
LPS: Low pressure switch
IDB: Induced draft blower
HPS: High pressure switch
Variable Frequency Drive (VFD): Control of the in-
duced draft blower is carried out by Variable Frequency
Drive. By varying the voltage and frequency to the
draft inducer, the RPM can be controlled. A section of
the IFC is dedicated to this task.
Trial for Ignition Period (TFI): The period of time
between initiation of gas flow and the action to shut
off the gas flow in the event of failure to establish
proof of the supervised ignition source or the super-
vised main burner flame.
Gas Valve Sequence Period: The total period of time
of gas flow starting from the first initiation of gas to
the final action to shut off the gas before going to
lockout.
Ignition Activation Period (IAP): The period between
energizing the main gas valve and deactivation of
the ignition source prior to the end of TFI.
Flame Recognition Period (FRP): The period between
deactivation of the ignition source and the expira-
tion of the TFI.
Flame Failure Response Time (FFRT): The period
between loss of the supervised main burner flame
and the action to shut off the gas supply.
Igniter Warm-up Time: The length of time allowed
for the hot surface igniter to heat up prior to the
initiation of gas flow.
Pre-purge Time: The period of time intended to al-
low for the dissipation of any unburned gas or re-
sidual products of combustion at the beginning of a
furnace operating cycle prior to initiating ignition.
100% (Max)
Closed
HPS
RPM 2
35% (Minimum)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gcvm97Acvm97Gmvm97

Table of Contents