Refrigerant Piping - Daikin R32 Split Series Installation Manual

Daikin room air conditioner
Hide thumbs Also See for R32 Split Series:
Table of Contents

Advertisement

Refrigerant Piping Work
2.

Refrigerant piping

CAUTION
• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R32 or R410A.)
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.
Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand. Then tighten them fully with the torque wrenches.
Do not apply refrigeration oil to
the flare nut to avoid tightening
with excessive torque.
2-1. Caution on piping handling
1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender
for bending.
2-2. Selection of copper and heat insulation materials
• When using commercial copper pipes and fittings, observe the following:
1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.035 to 0.045kcal/mh°C)
Refrigerant gas pipe's surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation
dimensions as below.
Gas side
O.D. 9.5mm
Thickness 0.8mm (C1220T-O)
3) Use separate thermal insulation for gas and liquid refrigerant pipes.
12
[Apply oil]
Do not apply refrigeration
oil to the outer surface.
Flare nut
Gas side
3/8 inch
32.7-39.9N • m
(330-407kgf • cm)
Liquid side
O.D. 6.4mm
Minimum bend radius
30mm or more
Apply refrigeration oil to
the inner surface of the
flare.
Flare nut tightening torque
Liquid side
1/4 inch
14.2-17.2N • m
(144-175kgf • cm)
Gas pipe thermal
insulation
I.D. 12-15mm
Thickness 10mm Min.
[Tighten]
Torque wrench
Spanner
Piping union
Flare nut
Be sure to
place a cap.
Rain
If no flare cap is
available, cover the
flare mouth with
tape to keep dirt
or water out.
Gas pipe
Gas pipe
insulation
Finishing tape
Liquid pipe thermal
insulation
I.D. 8-10mm
Wall
Inter-unit wire
Liquid pipe
Liquid pipe
insulation
Drain hose
English