Lincoln Electric power wave ac/dc 1000 sd Operator's Manual page 23

Table of Contents

Advertisement

A-14
PARALLEL CONNECTION CHECKLIST (See Figure A.8)
Place the Power Wave
Mount MAXsa™ 10 Controller.
Install MAXsa™ 22 Wire Drive and other accessories in their operating location.
The MAXsa™ Controller must be connected to the Master Power Source. Connect K2683-xx Heavy Duty
ArcLink Control Cable (5 pin) between Power Wave and MAXsa™ 10 controller.
Connect K1785-xx Wire Feeder Control Cable (14 pin) between the MAXsa™ 10 controller and the MAXsa™
22 feeder.
Connect a K1785-xx Wire Feeder Control Cable (14 pin) between the two power sources (top connectors).
Install Electrode Sense Lead (67) at the feeder and the Work Sense Lead (21) from the Lead Power Wave
AC/DC 1000
SD Master per guidelines.
®
Connect / Install welding cables to both the "master" and "slave" machine per recommended "Output Cable
Guidelines" (Table A.1).
Open the Power Wave
panel. (See Figure A.4).
Connect input power to Power Wave
Turn on Power Wave
Confirm that latest software is updated in all equipment prior to installation (www.powerwavesoftware.com)
For tandem setups, run the subarc cell configurator from PC Tools (See Section C of this manual or go to
www.powerwavesoftware.com).
Select a Welding process and configure starting and ending options.
INSTALLATION
AC/DC 1000
SD units in a suitable operating location.
®
®
®
AC/DC 1000
®
SD front panels and configure DIP switch settings per the decal on the
®
AC/DC 1000
AC/DC 1000
SD, and verify all system Status Lights are solid green.
®
®
POWER WAVE
®
SD units per recommended guidelines.
®
AC/DC 1000
®
SD
A-14
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents