11 mm Screws (6)
Missing Parts? Please Call 800-641-6996 For Assistance
Attaching The Upper Housing
1. Slide Upper Housing straight up and off of
lower housing and remove all packed items
from inside the heater. (See Figure 4)
2. Remove all packaging protecting the heater
during shipping. Retain caps for covering the
inlet connector and regulator hose fro storage.
3. Inspect heater closely for any damage that
may have occurred during shipping. If there is
any damage, return the heater to the place of
purchase.
Figure 4
© 2015, Pinnacle Products International, Inc.
NEVER LEAVE HEATER UNATTENDED WHILE BURNING,
CONNECTED TO A POWER SOURCE, OR WHILE
®
Assembly Instructions
What's In The Box
Regulator (1)
CONNECTED TO A FUEL SOURCE
4. Attach three (3) screws to the bottom row of
holes in the lower housing. (See Figure 5)
5. Slide upper housing over lower housing,
lining up the four remaining screw holes.
Insert three (3) screws and tighten securely.
(See Figure 5)
NOTE: Save carton and packaging material
for later storage.
Figure 5
5
Upper Housing (1)
Convection Heater User's Manual
Need help?
Do you have a question about the PT-200V-LPC-A and is the answer not in the manual?
Questions and answers