Quick Start; First Steps By An On-Site Qualified Technical Engineer; Required Equipment And Tools - MGE UPS Systems Epsilon STS 200A Installation And User Manual

Static transfer switch
Table of Contents

Advertisement

CAUTION
Final installation and start-up should be completed by a qualified MGE Field Service Engineer.
This On-site Quick Start will guide qualified engineers through unpacking and positioning the unit, the equipment,
tools, and steps required to perform power input/output connections to prepare the unit for MGE Field Service
Engineers to perform on-site final installation and startup.
To insure a successful installation, each of these (4) steps should be followed in their correct sequence.
Note that any unauthorized installation may cause damage to the UPS(s) and void the MGE warranty.

First steps by an on-site qualified Technical Engineer

Step 1.
Unpack and position the unit
Step 2.
Connect the main (utility) power
Step 3.
Connect the output to the power distribution panel
Step 4.
The MGE Field Service Engineer finalizes installation and the startup process.
Optional :
Procedure for temporary power prior to the final startup.

Required Equipment and Tools

The following equipment and tools are recommended for on-site installation:
Digital volt meter (DVM)
1/8 inch slotted screwdriver
Pallet jack/forklift
Conduit installation tools
Nut driver set
86-504004-00 B03
Scheduling of the MGE Field Service Engineers typically should be
done 7 to 10 days before they are required on-site. If the startup of
the UPS is critical to maintaining your schedule, please call the
MGE toll free telephone number at 1-800-438-7373 for assistance.
On-Site Quick Start

Quick Start

QS —1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Epsilon STS 200A and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sts 600aSts 400a

Table of Contents