Download Print this page

Service & Maintenance; Maintenance; Maintenance Log; Places To Contact For Service And Questions - MGE UPS Systems Esprit 3 User Manual

Slim line rack ups

Advertisement

7. Service & Maintenance
7A. Maintenance
Clean the UPS with a dry cloth after turning off all power to the UPS and switching off the power
switch.
The UPS performs monthly automatic battery tests. However, it is recommended that a 6 month test
be performed on the UPS for battery condition. Perform all tests off peak hours with applications
shut down.
1. Turn off power to the UPS via the branch circuit breaker to the UPS. It is not recommended
to disconnect the plug from the UPS to the utility power due to disconnection of the safety
ground.
2. Allow the UPS to run on battery power for 1 minute. Monitor the UPS for any fault LEDs and
if none are observed, return power to UPS and log results below in the maintenance log. If
battery fault LED is lit, call for service.

Maintenance Log

UPS serial number
Date
6th month
12th month
18th month
24th month
30th month
36th month
42nd month
48th month
54th month
60th month

Places to Contact for Service and Questions

In USA or Canada, call 1-800-438-7373 M - F 24 hours. For service outside USA or
Canada, call your local distributor. You may also visit our web site at: www.mgeups.com
Date of installation
Check
Location
Comments
Notes
7—1

Advertisement

loading

This manual is also suitable for:

Esprit 4