Copying (continued)
Copying from P2 cards to the HDD
High-speed copying from P2 cards to the HDD is possible because data is transferred directly to
the HDD.
Do not turn the unit OFF or eject P2 cards when the [P2C] or [HDD] LEDs are lit.
When using an optional battery pack, check the remaining level before copying data.
Copy operations are not possible in the following states.
• Low power error (The [ERROR] LED lights in red and the [E2] in [REMAIN] flashes in red.)
• Low battery pack charge error (detected when copying P2 cards of capacity 16 GB or higher)
(The [ERROR] LED lights in red and the [E2] in [REMAIN] lights in red.)
Replace with a fully charged, optional battery pack or switch to the use of an optional AC adaptor.
1. With the unit ON, insert a P2 card in the slot
2. Press the [HDD CAP] button and make sure there is enough space to copy at least one
card
If the capacity (in number of cards) is 0, copy needed data to other storage media and format
the HDD. (See page E-14 and E-19)
3. Hold the [START] button for at least 2 seconds
Copying begins, and the verification
The copying progress is indicated by the LEDs, as follows.
:
LED lit
, ,
Progress (%)
00-19
20-39
40-59
60-79
80-99
100
4. Make sure all the [COPY STATUS] LEDs are lit in green
5. Press the [POWER] button
Copying is complete and the [COPY STATUS] LEDs go out.
Note:
• Once the data on a P2 card has been copied to the HDD, it cannot be copied to the HDD again. If this is
the case, one of the following operations will be performed depending on the [VERIFY] switch setting.
[VERIFY] switch is OFF: Even when step 3 is taken, 100% is immediately displayed as the copying
[VERIFY] switch is ON: When step 3 has been taken, the data is not copied, 40-59% is displayed as
• Even after data on a P2 card has been edited, added or deleted by a computer or other device, it may be
recognized as the same data. If this is the case, one of the following operations will be performed
depending on the [VERIFY] switch setting.
[VERIFY] switch is OFF: Even when step 3 is taken, 100% is immediately displayed as the copying
[VERIFY] switch is ON: When step 3 has been taken, the data is not copied, 40-59% is displayed as
1)
is conducted (when the [VERIFY] switch is set to ON).
:
LED flashing
G :
green
COPY STATUS
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
progress status.
the copying progress status, and the verification is conducted.
progress status.
the copying progress status, the verification is conducted, the data is
recognized as different, and operation ends with the Verify NG error
page E-32)
OR :
orange
During
access
G
OR
G
G
G
G
During
access
OR
2)
. (See
(Continued on next page)
E-16

Advertisement

Table of Contents
loading

Table of Contents