Heating Priority Connections - Hayward Easy Temp ECP 06 Installation And Instruction Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
6. APPENDICES (continued)
6.2 Heating priority connections Single-Phase Pump
Single-phase pump
Terminals 1 and 2 deliver a potential-free dry
contact, 230 V~ / 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of
the pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents