Plumbing Requirements; Initial Setup - Bunn My Cafe MCO Installation & Operating Manual

Hide thumbs Also See for My Cafe MCO:
Table of Contents

Advertisement

RELEASED FOR PRODUCTION
These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi
(138 and 620 kPa) from a ½˝ or larger supply line. A shut-off valve should be installed in the line before the
brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345
kPa). The water inlet fitting is .75-11.5 NH (HOSE THREAD). For convenience an elbow adaptor is provided
to convert to a ¼˝ flare fitting. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized
water supply to this equipment.
NOTE - Bunn-O-Matic recommends ¼˝ copper tubing for installations of less than 25 feet and
25 feet from the ½˝ water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to
clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre-
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must
comply with the applicable Plumbing /Sanitation Code for your area.
NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between backflow pre-
venter and dispenser. Installing the shock arrestor as close to the dispenser as possible will provide the best
results.
Plumbing Hook-Up
1.
Flush the water line.
2.
Securely attach the adaptor elbow assembly to the ¼˝ flare fitting on water supply line.
3.
Securely attach adaptor elbow assembly to the the .75-11.5 NH fitting at the rear of the brewer.
4.
Turn on the water supply.
MAIN SWITCH
1. Connect to power source.
2. Turn on main switch.
3. Wait approximately ten minutes for the tank to fill and heat. The display will read "READY TO BREW" when
tank reaches it's operating temperature.
4.
The brewer is now ready for use in accordance with the instructions for Coffee Brewing.

PLUMBING REQUIREMENTS

INITIAL SET-UP
Page 5
DIR Num: 49251.0000
08, July 2014
" for more than
3
8
WATER LINE
CONNECTION
49251.0 040814

Advertisement

Table of Contents
loading

Table of Contents