Checking Subcooling; S-109A Two Speed Application - Goodman ASX Service Instructions Manual

Hide thumbs Also See for ASX:
Table of Contents

Advertisement

SERVICING
Superheat Formula = Suct. Line Temp. - Sat. Suct. Temp.
EXAMPLE:
a. Suction Pressure = 143
b. Corresponding Temp. °F. = 50
c. Thermometer on Suction Line = 61°F.
To obtain the degrees temperature of superheat, subtract
50.0 from 61.0°F.
The difference is 11° Superheat. The 11° Superheat would fall
in the ± range of allowable superheat.
SUPERHEAT AND SUBCOOLING ADJUSTMENT ON TXV
APPLICATIONS
1. Run system at least 10 minutes to allow pressure to
stabilize.
2. Temporarily install thermometer on liquid (small) line
near liquid line service valve with adequate contact and
insulate for best possible reading.
3. Check subcooling and superheat. Systems with TXV
application should have a subcooling and superheat of
7 ± 2ºF.
a.
If subcooling and superheat are low, adjust TXV
to 7 - 9ºF then check subcooling.
b.
If subcooling is low and superheat is high, add
charge to raise subcooling to 7 ± 2ºF then check
superheat.
c.
If subcooling and superheat are high, adjust TXV
valve to 7 ± 9ºF then check subcooling.
d.
If subcooling is high and superheat is low, adjust
TXV valve to 7 to 9ºF superheat and remove
charge to lower the subcooling to 7 ± 2ºF.
The TXV should NOT be adjusted at light load conditions
55º to 60ºF, under such conditions only the subcooling
can be evaluated. This is because suction pressure is
dependent on the indoor coil match, indoor airflow, and
wet bulb temperature. NOTE: Do NOT adjust charge
based on suction pressure unless there is a gross
undercharge.
4. Disconnect manifold set. Installation is complete.
S-109 CHECKING SUBCOOLING
Refrigerant liquid is considered subcooled when its tempera-
ture is lower than the saturation temperature corresponding
to its pressure. The degree of subcooling equals the degrees
of temperature decrease below the saturation temperature at
the existing pressure.
1. Attach an accurate thermometer or preferably a thermo-
couple type temperature tester to the liquid line as it
leaves the condensing unit.
2. Install a high side pressure gauge on the high side (liquid)
service valve at the front of the unit.
3. Record the gauge pressure and the temperature of the
line.
4. Review the technical information manual or specification
sheet for the model being serviced to obtain the design
subcooling.
5. Compare the hi-pressure reading to the "Required Liquid
Line Temperature" chart (page 43). Find the hi-pressure
value on the left column. Follow that line right to the
column under the design subcooling value. Where the
two intersect is the required liquid line temperature.
Alternately you can convert the liquid line pressure gauge
reading to temperature by finding the gauge reading in
Temperature - Pressure Chart and reading to the left, find
the temperature in the °F. Column.
6. The difference between the thermometer reading and
pressure to temperature conversion is the amount of
subcooling.
Add charge to raise subcooling. Recover charge to lower
subcooling.
Subcooling Formula = Sat. Liquid Temp. - Liquid Line
Temp.
EXAMPLE:
a. Liquid Line Pressure = 417
b. Corresponding Temp. °F. = 120°
c. Thermometer on Liquid line = 109°F.
To obtain the amount of subcooling subtract 109°F from
120°F.
The difference is 11° subcooling. See the specification sheet
or technical information manual for the design subcooling
range for your unit.

S-109A TWO SPEED APPLICATION

Run the remote on low stage cooling for 10 minutes until
refrigerant pressures stabilize. Follow the guidelines and
methods below to check unit operation and ensure that the
refrigerant charge is within limits. Charge the unit on low
stage.
1. Purge gauge lines. Connect service gauge manifold to
base-valve service ports. Run system at least 10 min-
utes to allow pressure to stabilize.
2. Temporarily install thermometer on liquid (small) line
near liquid line service valve with adequate contact and
insulate for best possible reading.
3. Check subcooling and superheat. Systems with TXV
application should have a subcooling of 5 to 7 ºF and
superheat of 7 to 9 ºF.
a.
If subcooling and superheat are low, adjust TXV to
7 to 9 ºF superheat, then check subcooling.
NOTE: To adjust superheat, turn the valve stem
clockwise to increase and counter clockwise to
decrease.
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssx

Table of Contents