Wall-mounting the product

1.
Check whether the wall has sufficient load-bearing ca-
pacity to bear the operational weight of the product.
2.
Check if the supplied fixing material may be used for
the wall.
Conditions: The load-bearing capacity of the wall is sufficient, The fixing
material may be used for the wall
Wall-mount the product as described.
1
2
3
Install the reinforced product bracket (1) on the wall.
Hang the shift-load cylinder on the product bracket from
above using the hanging bracket.
1
Hang the heat generator (2) on the product bracket on
the shift-load cylinder (1) from above using the hanging
bracket.
Conditions: The fixing material may not be used for the wall
Wall-mount the product as described using the permitted
fixing material provided on-site.
0020209593_01 ecoTEC plus Installation and maintenance instructions
4.9

Removing the front casing

Remove the front casing as shown in the illustration.
4.10

Removing the side section

2
Caution.
Risk of material damage caused by mech-
anical deformation.
Removing both side sections may cause
mechanical distortion in the product, which
may cause damage to the piping, for ex-
ample, and potentially result in leaks.
Installation 4
2x
13